ROOBALL U8 & U9 GROUND SET UP INSTRUCTIONS
1. The silver net bins with nets, U shaped pegs, hammer will be outside the shipping container.
2. 6 orange poles will be dropped on each field before you arrive. Orange poles are the corner and half way poles.
3. The portable posts unassembled will be located inside the shipping container.
4. One goal comprises two triangle shaped ends and two crossbars.
5. Please move these to the fields unassembled. The grounds are marked where the end of each goal is to be located. Fields are framed by existing field 3 lines and dotted lines where cut down.
6. Assembling the goals is best done with 3 people. The cross bar drops into holes located at top and bottom of the triangle ends. Pins are then inserted into holes and they in turn are secured by clips (attached by wire to the triangle ends) to holes in the pins.
7. PLEASE NOTE THE PORTABLE POSTS ONCE ERECTED ARE TO BE NETTED AND SECURED BY PEGS IMMEDIATELTY. AT NO TIME SHOULD THEY BE LEFT UNSUPERVISED BEFORE BEING SECURE TO THE GROUND WITH THE PEGS.
8. Nets can now be attached to the posts. Locate the top of the net by the side that has the most Velcro tables attached. Secure all the Velcro tabs to top and sides of nets. Pull the excess nets at bottom under the back and side bars and secure back onto itself with Velcro tabs attached.
9. Drive two U shaped pegs onto the side bars (one towards the front and one midway) of the goals and 3 evenly space across the back bar.
10. If you are the last team to play on that ground you need to pack down the fields. Corner posts are to be left outside the small cricket shed at the south east corner of field 3. Posts are to be unassembled immediately after pegs are removed and packed away in the shipping container along with the silver bin. Crossbars go along the right hand side wall and triangle shaped ends go on the front left side of the container.
|