SSG GROUND SET UP INSTRUCTIONS
1. The portable goals and orange poles will be dropped on each field before you arrive.
2. The portable goals are to be secured by 3 small pegs attached to the sides and back of the nets (hammer provided). The goals are located centrally each end of the field 10 metres from corners.
3. Four orange poles are the corner posts.
4. Two orange cones are to be located on each side of the fields at 15metrs from corners to signify the halfway line.
5. If you are the last game on that field. On conclusion of your game please remove all equipment (do not attempt to fold up the portable goals) and place it in front of the small cricket shed at the back south east corner of ground 3. The Head GM will lock away on conclusion of all games.
|